Industrial Spool
This 50 foot long spoon was shrink-wrapped to protect for transportation overseas.
This 50 foot long spoon was shrink-wrapped to protect for transportation overseas.
First we cover the electrical components with a Moisture Barrier Shrink Wrap as shown below
Then we encapsulate the entire heater destined for the Gulf of Mexico
These 3 towers where wrapped yesterday to allow for a lighting set up to be covered
This build was done so that the dust from building waste being thrown into a bin within the containment can be contained
Today our crew installed this roof cap to keep the building face dry during construction
This structure was wrapped to allow for weatherproof replacement of a skylight at a local Vancouver fire department today
These two 20' foot shipping container's that have been modified for personal use, we are wrapped for shipping
Debris Netting installed around this landmark to keep patrons safe during construction
This installation at the Vancouver Public Library was installed to catch concrete slurry water and directed into a catch basin well crews cut a portion of the concrete ceiling out
This shows the area where the water will be collected into prior to Shrink Wrap installation
This Containment was installed to keep the open area where a solarium is being replaced as well as the patio concrete membrane.
This is phase 1 of 2. We installed the Shrink Wrap and debris netting to keep the building dry while the rotten wood and leaking areas are replaced
This large job was completed today on Broadway Street in Vancouver.
This piece is destined for Washington state to the Boeing Plane assembly line.
Today we completed this job that entailed the installation of Debris Netting and Shrink Wrap as well as some scaffold installation.
This scaffold is fully shrink wrapped to keep any debris and particles contained. Rhino wrap installed the scaffold for access and the shrink wrap for protection of other projects in the shop affected by the dust created.
This potion in West Vancouver has water leaking under the tilework, and needed weatherproof coverage.
Small shrinkwrap canopies installed as well as debris netting to keep the marble installation on time and ensuring quality
As new ownership takes over this building protection is needed to upgrade the front façade
This customer had for shipping Seacans with an old awning separating them. We covered everything to allow for protection through any season
This hazardous containment will be used to keep the adjacent passengers safe from the work area while concrete remediation takes place