The original skylights are being removed and replaced while the building is live. Protection from the elements and to the public is key in this busy university.
Iono water treatment plant upgrades
This huge shrink wrap roof was done off scaffold and cables to create a containment so the blasters and painters could complete the upgrades.
Temporary rolling scaffold containment
This job allows the brick layers to move the scaffold where needed to complete the job in a dry environment
Mansion construction
This temporary roof protects high end upgrades on this West Vancouver mansion
Simon Fraser university
Another temporary roof for the roofers to complete the necessary upgrades
Community center upgrades
Keeping construction contained while this community center is still occupied - the shrink wrap and debris netting keeps the workers dry but also a barrier from pedestrian activity.
Simon Fraser university
Temporary shrink wrap shelter for roof upgrades - keeping class in session while necessary repairs are completed.
Mansion protection
This shrink wrap building envelope keeps the heat in and the work continuing on this massive Vancouver mansion.
Protection from the elements
This containment was for removal of a 20’ tall granite statue.
Exterior renovations
Debris netting and a shrink wrap canopy keeps this project on time and dry while the exterior is removed and replaced.
Simon Fraser University roof replacement
Temporary shrink wrap roof while the roof is redone, the building is occupied and this mitigates and potential water damage from occurring
Full house addition in Richmond
The roof was removed and and addition will be added, this temporary roof keeps the project dry and on time and on budget!
Downtown Vancouver temporary waterproof containment
This project was done to keep the building dry while the mechanical room is disassembled and replaced.
House addition
This temporary shrink wrap roof is to allow the roof to be removed and the new addition added while the rest of the is occupied.
Water treatment digester upgrades
The roof and other upgrades were being done on this digester for the Vancouver Water Treatment plant, Rhinowrap created a temporary roof containment to enclose sandblasting debris and keep it dry while being re roofed and painted.
Full seal asbestos containment
This fully sealed containment was to allow negative air pressure to keep the environment clean while the industrial dryer is taken apart and removed.
UBC Skylight replacement
Protecting the live building from the rain while the skylights are removed and replaced.
Balcony restoration
Protecting the exposed building while the balcony’s are removed and upgraded.
Demolition containment
This full seal enclosure was done at Port Moody Middle school it allows for the removal of hazardous materials from the inside, keeping everything contained.
Scaffold canopy for exterior restoration
Scaffold canopy to keep water out of the building while the windows and siding are removed and replaced.